MADC has proposed 100 MW (2 X 50) coal based Captive power plant spread over an area of about 45 Hectares. The power plant is being modeled without any assistance of grid power. The proposal is to have an uninterrupted assured power supply to the units in the SEZ area with the permissible voltage fluctuation +5%. Because of the benefits of the SEZ, the project cost will go down by about 30% and also the cost of power at the end use will be most economical. The power project is being established BOT basis on public- private partnership principal. A competent BOT developer, who will establish the power plant and carry out the transmission and distribution network in the area, will be selected on the least energy cost basis. He will be recovering the cost through energy tariff